Extension of 110 kV substation

12.2022 – 02.2022
Extension of 110 kV substation
Extension of 110 kV substation Port (PS 549) with increase of transformer capacity (stage 1 - installation of 110 kV MMPC 1x25 MVA)
St. Petersburg, Ust-Luga
Extension of 110 kV substation Port (PS 549) with increase of transformer capacity (stage 1 - installation of 110 kV MMPC 1x25 MVA)
St. Petersburg, Ust-Luga