220 kV Oka substation. Stage 2

Extension of 110 kV substation Port (PS 549) with increase of transformer capacity (stage 1 - installation of 110 kV MMPC 1x25 MVA)

Automation of an electric drying station for low-level solid radioactive waste (LRW) for the needs of LNPP.

Reconstruction of 35 kV cable line approaches Zavod Ilyich – Yuntolovo with a tap to PP Udelnaya and 35 kV cable line Zavod Ilyich – Olgino with taps, 0.15 km long, for connection to 35 kV switchgear at 330 kV substation Zavod Ilyich.

Construction of 330/110/35 kV substation Mendeleevskaya with 330 kV power line approaches.

Modernization of 110/6 kV substation No. 27 (replacement of 6 kV switchgear).

Reconstruction of 110/10/6 kV substation No. 156 Sosnovaya Polyana with increase of transformer capacity by 46 MVA.

5 BCTP 10/0.4 kV for the needs of JSC Zavod Elektropult.

Technical re-equipment of substation No. 68 of the Ammonia Workshop for the needs of PJSC Dorogobuzh.